Design mockup · Advanced Deconstruction homepage · Morello Web · 22 August 2026
1300 988 488 Enquire
Aerial drone view of the Ramada Hotel structural demolition, Windsor
Structural separation from the retained building at the Ramada Hotel
Excavator working through dust at the Grand Plaza cinema demolition, Browns Plains
Est. 2009 · 80% repeat business · Brisbane, national

High-risk. High-stakes. Done right.

Australia's specialist in complex demolition, asbestos management, soil remediation and technical works. Trusted by Acciona, Lendlease, Buildcorp and Airservices Australia on projects where the margin for error is zero.

Scroll
01 · DroneRamada Hotel Structural DemolitionWindsor, QLD
ISO 9001 QualityISO 14001 Environmental ISO 45001 SafetyClass A Asbestos Licensed Nationally Unrestricted Demolition Licence40+ Class A Technicians 20+ Truck & Dog Fleet16 Years Continuous Operation
Who we are

Not a general demolition contractor. A specialist in the jobs nobody else will price.

Sixteen years of continuous operation in high-risk, sensitive-environment structural demolition, asbestos management and soil remediation. Triple ISO certified. Class A asbestos licensed nationally, with unrestricted demolition licences in every state we work in.

Eighty percent of our work comes from repeat clients and referrals. In this industry that number is the only credential that cannot be bought, printed or claimed. It is the reason Tier 1 builders keep putting our name on the shortlist.

Structural separation from the retained building at the Ramada Hotel, Windsor
Ramada Hotel · Windsor, QLDUpper levels removed, adjoining structure retained and left standing
Credentials

The numbers
a buyer actually checks.

Pre-qualification is not a conversation, it is a checklist. Everything a procurement team needs to shortlist us sits on this one screen.

16
Years in operationEst. 2009
80%
Repeat businessAnd referrals
40+
Class A techniciansAsbestos licensed
20+
Truck & dog fleetBulk cartage
10
Sectors servedCommercial to defence
The company we keep

Tier 1 builders
keep coming back.

Acciona
Lendlease
Buildcorp
Higgins
Built
FDC
Intrec
Mettle
Alder
Airservices
Set typographically pending permission-cleared logo files
Aerial view of the Ramada Hotel structural demolition, Windsor
Featured project · Commercial

Ramada Hotel.
Taking the top off,
leaving the rest standing.

Challenge

Structural demolition of the upper levels of two buildings while keeping adjoining retained structures stable. Load-bearing masonry, columns, suspended slabs, balconies, stairways and a swimming pool structure, all under restricted access with live interfaces.

Approach

A staged methodology built on engineered temporary propping, controlled sequencing and containment demolition scaffold. Robotic demolition, concrete cutting, excavators and cranage removed structural elements inside constrained areas.

Outcome

Adjoining structures protected and safe conditions held at every stage, including slab cutting for the new basement lift shaft and formed wall penetrations, all under detailed demolition and safety documentation.

WINDSOR, QLD
Location
3 MONTHS
Duration
2 BUILDINGS
Upper levels removed
ROBOTIC
Demolition method
UNRESTRICTED
Licence class
Structural separation from the retained building
Structural separation from the retained building
Containment demolition scaffold
Containment demolition scaffold
Plant working within the constrained site
Plant working within the constrained site
Sectors

Find your
kind of job.

Ten sectors, each with its own compliance regime, access constraints and approval pathway. Pick yours and see the work that matches it.