The neighbours stay open
Commercial demolition rarely happens on an empty block. The tenancy next door, the centre across the lane and the office upstairs all keep trading.
Demolition, strip-out and remediation in and around buildings that are still earning. Hotels, cinemas, offices and mixed-use sites, delivered beside trading tenancies, occupied neighbours and structures that have to stay standing.
Commercial demolition rarely happens on an empty block. The tenancy next door, the centre across the lane and the office upstairs all keep trading.
The incoming build already has a start date. Demolition is the first thing on the critical path, so it cannot be the thing that slips.
More often than not something is being kept: a facade, a podium, the building next door. What stays decides how everything else comes down.
Inner-city sites mean restricted access, no laydown and live interfaces on every boundary.
Head contractors need the methodology, sequence and safety documentation before anyone mobilises, not after.
It is the normal case for us. The Grand Plaza cinema demolition sat immediately beside a trading shopping centre, with live service lines running to major tenancies inside it, and the whole programme ran as night works.
Yes. At the Ramada Hotel we removed the upper levels of two buildings while the adjoining structures stayed in place, using engineered temporary propping, containment demolition scaffold and a designed removal sequence.
Both of our recent commercial projects were delivered for head contractors. We also take work direct from developers and owners, where being involved before the demolition is priced usually saves the most.
Demolition methodology, sequencing and safety documentation before mobilisation, and the records to show what was done at handover. On a commercial job the paperwork is part of the programme.
It is separated on site and diverted to recycling wherever it can be. On the Grand Plaza cinema demolition the majority of the structure was diverted from landfill.










Scope, drawings, site constraints. We will tell you what is actually involved, including the parts nobody else mentions.
Start an enquiry Emergency responseStructural failure, unexpected asbestos, a site that has to be made safe today. Straight to a person, not a form.
1300 988 488 Capability statementThe full capability statement, licences and recent project record, as a PDF you can put in front of a pre-qual panel.