The hazards come first
Before a structure is touched, whatever was stored, processed or leaked inside it has to be identified and controlled.
Plant, warehouses and industrial structures taken down and cleared, and the contamination they leave behind dealt with. PFAS, PCBs, heavy metals, hydrocarbons, silica, mould and lead paint dust.
Before a structure is touched, whatever was stored, processed or leaked inside it has to be identified and controlled.
Decades of use leave contamination in the soil and fill, and the site cannot be redeveloped until it is dealt with.
Every chemical hazard needs its own mitigation and control plan, not a generic one.
Steel frames, thick slabs and plant foundations take the right method and the right machine.
The next owner, the council and the financier all want proof of what was removed and where it went.
We came to hazardous substances through demolition and asbestos. Enough jobs turned up chemical hazards that controlling them became part of the work, not a reason to stop it.
Project case studies for this sector are being documented and will appear here.
PFAS including PFOA and PFOS, PCBs, heavy metals, petroleum hydrocarbons, organic chlorides, silica dust, mould, and lead paint and process dust, as well as asbestos.
Yes. Contaminated land assessment, Remediation Action Plans and bulk earth remediation are part of our soil remediation capability, and are often the job that follows an industrial demolition.
Yes, including friable material like lagging and refractory, under our Class A licence.
Because on an industrial site they are the same job. The hazards have to be controlled before the structure comes down, and whoever takes the structure down finds out first what was in it.










Scope, drawings, site constraints. We will tell you what is actually involved, including the parts nobody else mentions.
Start an enquiry Emergency responseStructural failure, unexpected asbestos, a site that has to be made safe today. Straight to a person, not a form.
1300 988 488 Capability statementThe full capability statement, licences and recent project record, as a PDF you can put in front of a pre-qual panel.
Download