The neighbours are children
Students and staff are on site, and nobody gets to be casual about where the work area ends.
Asbestos removal, demolition and remediation for education facilities, where the people on the other side of the hoarding are children. Every area cleared independently before anyone goes back in.
Students and staff are on site, and nobody gets to be casual about where the work area ends.
Term dates and holidays decide when the heaviest work can happen.
A lot of school building stock is old enough to contain asbestos, often in more than one form.
A classroom does not reopen on the contractor saying it is fine.
Parents, neighbours and the school community all need to know what is happening and when.
We deliver asbestos removal for education facilities, to exactly the same process and documentation as every other job we do.
Project case studies for this sector are being documented and will appear here.
An asbestos work area is established with sheeting to control the movement of dust and air, and obstructions are only removed once that containment is up. The work area is kept as small as possible.
Before we arrive, safety documentation is prepared, the regulator is notified of the work, and we provide a notification letter for you to pass on to neighbours.
Every job closes with a clearance inspection by a competent person independent of the removal work, who checks the work area for any visible dust or debris of any kind. A room goes back into use on that inspection, not on our word.
Yes. Asbestos-contaminated soil and fill is remediated under our Class A and B licences as part of our soil remediation work.










Scope, drawings, site constraints. We will tell you what is actually involved, including the parts nobody else mentions.
Start an enquiry Emergency responseStructural failure, unexpected asbestos, a site that has to be made safe today. Straight to a person, not a form.
1300 988 488 Capability statementThe full capability statement, licences and recent project record, as a PDF you can put in front of a pre-qual panel.
Download